I got the test parts back from waterjet cutting. A big thanks to Burak at
Flexyshop! The following photos show the basic parts. I will assembly the unit week and post some snaps of the complete stick. It will allow for a case as shallow as 1.5" and only requires two screws to mount. The bezel will come in a week or so once all throws are finalized.
Parts place in position.
The reason it's called Luck Seven.
Elevator bock close up.
No comments:
Post a Comment